COMMERCIAL PROJECTS




Bristol County Sheriff's Office
Working high above the ground on this one, approximately 120' to be exact renovating this cupola with one coat of primer and two coats of paint.




Blackstone Valley Prep
One of our biggest projects where this three story addition was added to the existing school. Consisted of concrete block and drywall where all walls received one coat of primer and two coats of paint. The steel doors and frames throughout the school received six coats of paint. The staircases received two coats of paint on the stair risers along with the underside of them, railings two coats, and the walls had a two tone paint job.




Higashi School
This project consisted of applying one coat of a epoxy primer and two coats of the epoxy finish onto the ceilings as well as the CMU walls. The finished project is the pool house for the outdoor pool for the school.




Laconia Post Office
Working up on the roof updating the condition of two roof ventilators, and one roof hatch by scraping, sanding, applying one coat of primer and two coats of finish.




North Chelmsford Post Office
Small job here by applying one coat of primer and two coats of a bright blue finish to these handrails.




Rise Academy
This project started off by having one large room divided into two separate classrooms where all walls were properly prepared for one coat of primer and two coats of paint. In addition, the trim work along with the doors and frames received two coats of paint.




Saint Thomas More Church
This renovation involved applying one coat of primer and two coats of paint to the ceilings, walls, staining the lower half of wall, and staining the doors. In addition, the windows and all wood trim work received primer and paint.